Optimization and Automation for the Naval Shipbuilding Industry

View Presentation

Raj Bishnoi, Account Manager, Altair (on behalf of General Dynamics Electric Boat)

In the Ship building industry, foundation design and verification is a very time consuming task, especially with the repetitive loops of design and validation. If we also include weight savings and shorter turnaround times into the equation, the task becomes even more daunting.
Have a Question? If you need assistance beyond what is provided above, please contact us.